Rackla Metals confirms high-grade tungsten mineralization in first Lentung drill holes

PUBT · 1d ago
Rackla Metals confirms high-grade tungsten mineralization in first Lentung drill holes
  • Rackla Metals reported first modern drilling at its Lentung tungsten project in Canada’s Northwest Territories confirmed broad, high-grade mineralization.
  • Four diamond holes in the Central Zone returned 17.9–20.5 meters grading 0.90%–2.28% WO3, with copper up to 0.14%.
  • Mineralization outcrops at surface, dips shallowly, and has been tested over 600 meters of strike to date.
  • Results support a 1982 Union Carbide resource model; additional 2026 assays are expected within two to three months for a new resource estimate.
  • Rackla halted reverse-circulation drilling due to groundwater-related sample-quality concerns; diamond drilling continued under the same conditions.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Rackla Metals Inc. published the original content used to generate this news brief via TheNewswire (Ref. ID: 202610130700TNWSWRCACNPR_____1k49F1apo) on October 13, 2026, and is solely responsible for the information contained therein.