On October 9, the “Ushakov” LNG carrier docked at CNPC Jiangsu LNG Terminal in Yangkou Port, Rudong, Jiangsu. This is the 900th LNG ship that has been unloaded since the terminal was built and put into operation in 2011.

Zhitongcaijing · 2d ago
On October 9, the “Ushakov” LNG carrier docked at CNPC Jiangsu LNG Terminal in Yangkou Port, Rudong, Jiangsu. This is the 900th LNG ship that has been unloaded since the terminal was built and put into operation in 2011.