Recently, the first crude oil generator set of the Kaiping cylinder FPSO project, which was carried out by CSIC Shanchai, completed in-plant handover tests, achieving another milestone breakthrough in the field of high-end domestic offshore power equipment. The largest cylindrical “offshore oil and gas plant” in Asia has a full load displacement of over 170,000 tons and a maximum oil storage capacity of 122,000 cubic meters. Using strict design standards that have not returned to the dock for 30 years, the complexity of the project has reached a new high in domestic offshore engineering.

Zhitongcaijing · 2d ago
Recently, the first crude oil generator set of the Kaiping cylinder FPSO project, which was carried out by CSIC Shanchai, completed in-plant handover tests, achieving another milestone breakthrough in the field of high-end domestic offshore power equipment. The largest cylindrical “offshore oil and gas plant” in Asia has a full load displacement of over 170,000 tons and a maximum oil storage capacity of 122,000 cubic meters. Using strict design standards that have not returned to the dock for 30 years, the complexity of the project has reached a new high in domestic offshore engineering.