Today, significant progress has been made at the G3033 Kuidoku Expressway. The key control projects of the entire line, the Kezai Tunnel and the Yushimorege Tunnel, successfully entered the tunnel, and the main construction of the tunnel was officially started. The two 15-kilometer long tunnels, Kezai and Yuximolegai, which cross the northern Tianshan section, are the “major underground arteries” connecting the north and south of Tianshan Mountain. They are key control projects for the G3033 Kuiduku Expressway.

Zhitongcaijing · 2d ago
Today, significant progress has been made at the G3033 Kuidoku Expressway. The key control projects of the entire line, the Kezai Tunnel and the Yushimorege Tunnel, successfully entered the tunnel, and the main construction of the tunnel was officially started. The two 15-kilometer long tunnels, Kezai and Yuximolegai, which cross the northern Tianshan section, are the “major underground arteries” connecting the north and south of Tianshan Mountain. They are key control projects for the G3033 Kuiduku Expressway.