Dakota Gold selects single heap-leach facility, 0.5-inch crush size for Richmond Hill PFS

PUBT · 23h ago
Dakota Gold selects single heap-leach facility, 0.5-inch crush size for Richmond Hill PFS
  • Dakota Gold set key design inputs for the Richmond Hill oxide heap-leach pre-feasibility study, selecting a 0.5-inch crush size.
  • Modeled ultimate gold recovery averaged 80.4% at 0.5-inch crush size versus 75.9% at 1-inch in recent metallurgical testing.
  • A single heap-leach facility site was chosen within the Phase 1 area outlined in the prior initial assessment, replacing a multi-facility concept.
  • Final assays needed for the PFS resource update were received, covering 42,791 meters of 2025-2026 drilling across 333 holes.
  • The PFS is targeted for Q4 2026; a feasibility study is expected mid-2027, supporting a production goal as soon as 2029.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Dakota Gold Corporation published the original content used to generate this news brief via Newsfile (Ref. ID: 202609280630NEWSFILECNPR____20260928_316209_1) on September 28, 2026, and is solely responsible for the information contained therein.