Sun Peak Metals drills 39 m at 1.38% copper at Safra VMS project in Saudi Arabia

PUBT · 1d ago
Sun Peak Metals drills 39 m at 1.38% copper at Safra VMS project in Saudi Arabia
  • Sun Peak Metals reported maiden diamond-drill results from the 100%-owned Safra VMS project in Saudi Arabia.
  • Best intercept: 39 m grading 1.38% copper, 0.84% zinc in hole SAF26DD008; includes 17.75 m at 1.6% copper.
  • Hole SAF26DD005 returned 19.42 m at 1.17% copper, 2.59% zinc, 22.35 g/t silver; includes 3 m at 3.08% copper.
  • Initial program drilled 10 holes for 1,242 m across Safra Main, Safra South; all seven Safra Main holes hit sulphide mineralization.
  • Work now targets step-out drilling at Safra Main, follow-up on untested gravity anomalies at Safra North, Safra East.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Sun Peak Metals Corp. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202609080700ACCESSWRNAPR_____1217941) on September 08, 2026, and is solely responsible for the information contained therein.