Coates hybrid power trial cuts diesel use 87% on DT Infrastructure WA project

PUBT · 1d ago
Coates hybrid power trial cuts diesel use 87% on DT Infrastructure WA project
  • Coates Hire outlined hybrid off-grid power results from a Western Australia DT Infrastructure site facilities deployment, published Sept. 1, 2026.
  • Average daily diesel use fell 87% to 6.15 liters from 48 liters, cutting CO2 emissions 87% to 16.48 kg.
  • Engine run time dropped 94% to 1.5 hours per day from 24, reducing noise and diesel exhaust exposure on a 24/7 site.
  • Projected 12-month impact: 14,965 liters of diesel saved, about 40 metric tons of CO2 avoided, 8,064 generator hours eliminated.
  • Indigenous partner Djookian supplied the hybrid system, contributing about 30% Indigenous spend across the site facilities scope.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Coates Hire Limited published the original content used to generate this news brief on September 01, 2026, and is solely responsible for the information contained therein.