The National Development and Reform Commission and the National Energy Administration issued the “Fifteenth Five-Year Plan” for the construction of a new power system. By 2030, the new power system will be initially built: a green and low-carbon power supply pattern has basically been formed, with non-fossil energy accounting for 50% of power generation; power supply capacity continues to increase, the level of complementarity and safety resilience of the power system has increased dramatically, and the sufficiency of power supply is maintained at a reasonable level to effectively meet the electricity needs of the people for economic and social development and a better life; initial construction of a safe, reliable, green, low-carbon, resilient, intelligent and flexible new grid and resource allocation platform The role and service functions were fully utilized, achieving 2.8 billion kilowatts.

Zhitongcaijing · 3d ago
The National Development and Reform Commission and the National Energy Administration issued the “Fifteenth Five-Year Plan” for the construction of a new power system. By 2030, the new power system will be initially built: a green and low-carbon power supply pattern will basically be formed, with non-fossil energy accounting for 50% of power generation; power supply capacity continues to increase, the level of complementarity and safety resilience of the power system has increased dramatically, and the sufficiency of power supply remains at a reasonable level to effectively meet the electricity needs of the people for economic and social development and a better life; initial construction of a safe, reliable, green, low-carbon, resilient, intelligent and flexible new grid and resource allocation platform The role and service functions were fully utilized, achieving 2.8 billion kilowatts.