At noon on July 31, the Suishen Intercity Bamboo Street to Xintang South section, located in the Guangdong-Hong Kong-Macao Greater Bay Area, was opened and operated, with a total length of 48.2 kilometers. With the addition of the Ho-Shenzhen Intercity Intercity Xintangnan to Shenzhen Airport section, which was previously in operation, the Ho-Shenzhen Intercity Railway has been fully operational since then. The “Greater Bay Area on Track” has added another important channel.

Zhitongcaijing · 1d ago
At noon on July 31, the Suishen Intercity Bamboo Street to Xintang South section, located in the Guangdong-Hong Kong-Macao Greater Bay Area, was opened and operated, with a total length of 48.2 kilometers. With the addition of the Ho-Shenzhen Intercity Intercity Xintangnan to Shenzhen Airport section, which was previously in operation, the Ho-Shenzhen Intercity Railway has been fully operational since then. The “Greater Bay Area on Track” has added another important channel.