On July 24, Harbin Electric Power Co., Ltd. announced that China's export of the 504 MW hydroelectric power unit with the largest stand-alone capacity, the No. 1 runner of the Tabela Phase V expansion project in Pakistan, was successfully developed at the Harbin Electric Southern R&D and manufacturing center, and left for Pakistan. This means that a major breakthrough has been made in the development of core equipment for energy engineering that marks the China-Pakistan Economic Corridor.

Zhitongcaijing · 2d ago
On July 24, Harbin Electric Power Co., Ltd. announced that China's export of the 504 MW hydroelectric power unit with the largest stand-alone capacity, the No. 1 runner of the Tabela Phase V expansion project in Pakistan, was successfully developed at the Harbin Electric Southern R&D and manufacturing center, and left for Pakistan. This means that a major breakthrough has been made in the development of core equipment for energy engineering that marks the China-Pakistan Economic Corridor.