Emirates President Tim Clark: The engine maintenance delivery cycle was too long and could not be installed in time. It is already causing us losses. It is unacceptable to park 28 engines in the hangar awaiting overhaul.

Zhitongcaijing · 3d ago
Emirates President Tim Clark: The engine maintenance delivery cycle was too long and could not be installed in time. It is already causing us losses. It is unacceptable to park 28 engines in the hangar awaiting overhaul.