Auriginal Mining confirms gold-rich VMS system at Roger project, drills 32.6 g/t gold over 1.2 m

PUBT · 3d ago
Auriginal Mining confirms gold-rich VMS system at Roger project, drills 32.6 g/t gold over 1.2 m
  • Auriginal Mining reported drill results confirming a gold-rich VMS system above its Roger copper-gold porphyry project in Quebec.
  • Hole AUR-26-04A returned 32.6 g/t gold over 1.2 m at depth; other intercepts included 4.01 g/t over 2.8 m.
  • Hole AUR-26-03 intersected massive sulphides grading 1.55 g/t gold, 41.2 g/t silver, 0.18% copper over 4.2 m.
  • Downhole EM and gravity surveys outlined a strong anomaly south of hole AUR-26-06; the hole is being extended 200 m to test it.
  • Company budgeted an additional $2 million for follow-up drilling at Roger later this summer or fall.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Auriginal Mining Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202607140600NEWSFILECNPR____20260714_305036_1) on July 14, 2026, and is solely responsible for the information contained therein.