The reporter learned from the Ministry of Water Resources that during the “15th Five-Year Plan” period, China will speed up the construction of a modern water network with “complete systems, safety and reliability, intensive efficiency, green intelligence, smooth circulation, and orderly regulation.” The central line river diversion project was basically completed, and the planning and construction of a number of major cross-watershed and cross-regional drainage projects was promoted; the construction of regional river and lake water system connections and drainage projects was accelerated; the construction of controlled storage projects and key water source projects was accelerated, and a modern reservoir operation and management matrix was basically built. At the same time, it opened up the “last mile” of the water network, promoted the modernization and transformation of irrigation areas, and added 40 million mu of arable land to be irrigated. The standardized construction and management model for rural water supply has been fully implemented. The rural tap water penetration rate has reached 98%, large-scale water supply projects have covered 78% of the rural population, and the proportion of county management and specialized management has reached 90%.

Zhitongcaijing · 01/05 08:17
The reporter learned from the Ministry of Water Resources that during the “15th Five-Year Plan” period, China will speed up the construction of a modern water network with “complete systems, safety and reliability, intensive efficiency, green intelligence, smooth circulation, and orderly regulation.” The central line river diversion project was basically completed, and the planning and construction of a number of major cross-watershed and cross-regional drainage projects was promoted; the construction of regional river and lake water system connections and drainage projects was accelerated; the construction of controlled storage projects and key water source projects was accelerated, and a modern reservoir operation and management matrix was basically built. At the same time, it opened up the “last mile” of the water network, promoted the modernization and transformation of irrigation areas, and added 40 million mu of arable land to be irrigated. The standardized construction and management model for rural water supply has been fully implemented. The rural tap water penetration rate has reached 98%, large-scale water supply projects have covered 78% of the rural population, and the proportion of county management and specialized management has reached 90%.