Xi'an Metro Line 15 was officially opened and operated on December 29. The total length of Xi'an Metro Line 15 is 19.459 kilometers. It has 13 underground stations, connecting the three major sectors of Xi'an High-tech Zone, Chang'an District, and Aerospace Industrial Base. Wang Cheng, project leader of China Railway 21st Bureau, explained that this line is equipped with fully automated driving technology and can reach a maximum speed of 100 kilometers per hour. The station decoration incorporates Han and Tang elements, focusing on creating a “one stop, one scene” characteristic experience, reflecting Xi'an's deep cultural heritage. Up to now, the opening mileage of the Xi'an Metro has reached 422 kilometers.

Zhitongcaijing · 2d ago
Xi'an Metro Line 15 was officially opened and operated on December 29. The total length of Xi'an Metro Line 15 is 19.459 kilometers. It has 13 underground stations, connecting the three major sectors of Xi'an High-tech Zone, Chang'an District, and Aerospace Industrial Base. Wang Cheng, project leader of China Railway 21st Bureau, explained that this line is equipped with fully automated driving technology and can reach a maximum speed of 100 kilometers per hour. The station decoration incorporates Han and Tang elements, focusing on creating a “one stop, one scene” characteristic experience, reflecting Xi'an's deep cultural heritage. Up to now, the opening mileage of the Xi'an Metro has reached 422 kilometers.