The Zaporizhzhia Nuclear Power Plant issued an announcement on the 23rd stating that its Unit 1 has obtained an operating license issued by the Russian Federal Service for Technical Supervision. The license is issued in accordance with the requirements of the Russian Federation's laws, regulations and regulatory documents relating to the use of nuclear energy, and is valid for 10 years. Unit 1 of the Zaporozhye Nuclear Power Plant was officially put into operation on December 10, 1984, and its original design operating life had previously been extended to December 25, 2025. The nuclear power plant said that obtaining the license this time is a key step to ensure the long-term and safe operation of the power plant unit beyond the design period.

Zhitongcaijing · 1d ago
The Zaporizhzhia Nuclear Power Plant issued an announcement on the 23rd stating that its Unit 1 has obtained an operating license issued by the Russian Federal Service for Technical Supervision. The license is issued in accordance with the requirements of the Russian Federation's laws, regulations and regulatory documents relating to the use of nuclear energy, and is valid for 10 years. Unit 1 of the Zaporozhye Nuclear Power Plant was officially put into operation on December 10, 1984, and its original design operating life had previously been extended to December 25, 2025. The nuclear power plant said that obtaining the license this time is a key step to ensure the long-term and safe operation of the power plant unit beyond the design period.