At 2:00 a.m. this morning, the Xian High Speed Rail Tongchuan Cross-Baomao Expressway Special Bridge was successfully completed. The total length of the Xi-Yan High Speed Rail Tongchuan Bridge over the Baomao Expressway was about 581.2 meters, and the main span of the large bridge was 80 meters long. As a key control construction project for the West Yan High Speed Rail, the Tongchuan Bridge over Baomao Expressway was successfully completed, marking a new breakthrough in the construction of the West Yan High Speed Rail and laying the foundation for the completion and opening of the entire line to traffic as scheduled.

Zhitongcaijing · 08/31 03:33
At 2:00 a.m. this morning, the Xian High Speed Rail Tongchuan Cross-Baomao Expressway Special Bridge was successfully completed. The total length of the Xi-Yan High Speed Rail Tongchuan Bridge over the Baomao Expressway was about 581.2 meters, and the main span of the large bridge was 80 meters long. As a key control construction project for the West Yan High Speed Rail, the Tongchuan Bridge over Baomao Expressway was successfully completed, marking a new breakthrough in the construction of the West Yan High Speed Rail and laying the foundation for the completion and opening of the entire line to traffic as scheduled.