Kumho E&C Selected for Detailed Design of Gadeokdo New Airport Access Road

PUBT · 1d ago
Kumho E&C Selected for Detailed Design of Gadeokdo New Airport Access Road
  • Kumho Engineering & Construction was selected on Nov. 20, 2026, for detailed design of the Gadeokdo New Airport access road.
  • Its 25% share represents estimated construction costs of KRW 134.1 billion, excluding VAT.
  • Total project construction costs are estimated at KRW 536.3 billion, excluding VAT.
  • The company's share equals approximately 6.64% of its 2025 consolidated revenue.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Kumho Engineering & Construction Co. Ltd. published the original content used to generate this news brief via DART, the regulatory disclosure system operated by the South Korea Financial Supervisory Service (FSS) (Ref. ID: 20261120800884), on November 20, 2026, and is solely responsible for the information contained therein.