The People's Government of Xinxiang City, Henan issued a notice on Baolong International Community heat pipeline leak disposal and accountability: At 00:00 on November 15, 2026, our city officially started centralized heating, and the city's heating started smoothly. However, Baolong International Community in Hongmen Town, Hongqi District, discovered a leak when starting the heat station's secondary network heating and pressurization. The Municipal Urban Management Bureau immediately arranged for the thermal power company to launch an emergency plan, investigate the leak, and begin emergency repairs. After thorough investigation, it was determined at 21:00 on the 15th that the leak point was a leak in the weld at the pipe connection. Intensive emergency repairs are currently being carried out. It is expected that emergency repairs can be completed on the 16th to reduce pressurization and increase heating. Judging from the review and site excavation, the direct cause of this leak was due to irregular pipeline network construction in the early stages. However, at the same time, it was revealed that heating companies are not solid in “treating winter diseases and summer diseases”, and problems such as failure to investigate and eliminate hidden heating hazards in advance; poor supervision by industry supervisory authorities; and inadequate monitoring by territorial governments in terms of routine inspections of heating and organizing training for property companies and responding to emergencies.

Zhitongcaijing · 2d ago
The People's Government of Xinxiang City, Henan issued a notice on Baolong International Community heat pipeline leak disposal and accountability: At 00:00 on November 15, 2026, our city officially started centralized heating, and the city's heating started smoothly. However, Baolong International Community in Hongmen Town, Hongqi District, discovered a leak when starting the heat station's secondary network heating and pressurization. The Municipal Urban Management Bureau immediately arranged for the thermal power company to launch an emergency plan, investigate the leak, and begin emergency repairs. After thorough investigation, it was determined at 21:00 on the 15th that the leak point was a leak in the weld at the pipe connection. Intensive emergency repairs are currently under way. It is expected that emergency repairs can be completed on the 16th to reduce pressurization and increase heating. Judging from the review and excavation situation at the site, the direct cause of this leak was due to irregular pipeline network construction in the early stages. However, at the same time, it was revealed that heating companies are not solid in “treating winter diseases and summer diseases”, and problems such as failure to investigate and eliminate hidden heating hazards in advance; poor supervision by industry supervisory authorities; and inadequate monitoring by territorial governments in terms of routine inspections of heating and organizing training for property companies and responding to emergencies.